QSP 20 – Design Installation and Commissioning – BioEnergy Projects
The purpose of this procedure is again to provide structure and guidance for the construction team to follow so the project can be built and handed over in a logical, efficient and complete manner.
Design:-
- JEG design follows current regulations
- Completed in accordance with client’s drawings and specifications
- RFI’s used to clarify potential issues
- Internal design review carried out before final design issued
Installation:-
- All activities are managed by the Construction Manager
- Plant, materials and labour must all be provided in a timely manner
- Additions and variations must be detailed for the Contracts manager to attend to.
Commisioning:-
- Once systems are completed to the required standards, pressure testing is carried out.
- Commissioning of equipment is carried out by specialist third party.
As-built drawings, all certification and O&M manuals are prepared and handed over to the client for maintenance purposes.